GEOVIA Whittle

Overview

GEOVIA Whittle enables open pit mining companies to first accurately evaluate the financial viability of a mineral deposit and options for capital investment and development, then determine the optimal long-term strategic mine plan and schedule to extract the full value of that deposit over the life of the mine. Through a range of customizable components, including strategic scheduling, detailed cost, price, and recovery modelling, multiple scenario analyses, blending, cut-off and simultaneous stockpile optimization, Whittle empowers mines to achieve full, end-to-end mine optimization — a process proven to improve net present value well above pit optimization alone.

GEOVIA Whittle Roles

  • GEOVIA Pit Optimizer
    Find the optimal mining strategy utilizing a combination of economic, physical, geotechnical and operational constraints.
  • GEOVIA Pushback Optimizer
    Create Strategic Mine Plans linking in Milawa’s Life of Mine Scheduling approach focused on NPV or material balance.

  • GEOVIA Blend Optimizer
    Optimize blend considering the schedule and existing stockpiles to ensure these are optimized at the same time, driven by the overall objective of maximizing the Net Present Value (NPV) of the whole operation.

  • GEOVIA Multi-Mine Optimizer
    Perform a single optimization over a complex collection of mines all while maintaining individual work constraints for each mine. Producing a more realistic overall schedule from the different areas all within the one optimization framework.

  • GEOVIA Simultaneous Optimizer
    Simultaneously optimize schedules, cut-offs, stockpiles and blend for the life of the operation. Find better outcomes compared to traditional methods resulting in higher Net Present Value (NPV) for the operation.

Related products

0
Empty Cart Your Cart is Empty!

It looks like you haven't added any items to your cart yet.

Browse Products